HPE term structure: how front-month IV compares to back-month IV across the curve.
HPE Term Structure
Hewlett Packard Enterprise — 30-day vs 90-day implied volatility across expirations
Close$42.30+2.36 (+5.91%)Nov 27 close
Hewlett Packard Enterprise (HPE) closed at $42.30 on Nov 27; its VRP is -29.3pp (implied volatility below realized); no earnings report is scheduled; the current IV curve by expiration is not published in the public view, and the chart is a labelled illustration.
How are HPE options priced across near and far expirations?
EARNINGS CONTEXT · CALENDAR WINDOWS
HPE: time to the next report
No upcoming earnings date is on file as of Nov 27. This does not mean there will be no report.
The seven-horizon IV curve is not shown on this public page.
Current factors
VRP
-29.3pp
As of · All: Nov 27 close
How to read this
What the curve is
The implied volatility of options at seven fixed horizons, from 10 days to one year, all annualized and all from the same close.
What a report does to it
A horizon that reaches a scheduled earnings report has the report inside its window; one that ends before it does not.
What it is not
Not a forecast of direction or of movement, and not a signal to trade.
Method & data
Curve
Paying subscribers receive the current ORATS constant-maturity IV snapshot through an authenticated request. Public calendar context and the optional fixed illustration contain no current IV levels.
Axis
The illustrated IV curve uses equally spaced tenor categories. The separate earnings panel uses calendar windows from its own dated close; these are not listed option expirations.
Difference
The current comparison subtracts the same snapshot’s unrounded 90-day IV from 30-day IV, in percentage points. The optional illustration compares only its fixed illustrative levels. No historical curve change is inferred.
Report
The published earnings date and its own as-of close determine the calendar-window context. A report on the window end date requires announcement timing.
Date
Dates belong to the stated source: the earnings calendar or each past report.
Caveat
Implied volatilities by horizon: not a forecast and not a trade signal
About this page's text
Data date
Every ticker-specific figure in this text is read from VolRadar's end-of-day data for the Nov 27 close and changes only when a new close is published; illustrative figures elsewhere on a page are never part of it.
How this text is made
The sentences are generated from that dated data by fixed written rules, the same rules for every ticker; nothing is written by hand for one ticker and no language model writes it at request time.
Why it exists
To answer, from public facts, what HPE's latest close says about this report, and to point to the method behind it.
HPE (Hewlett Packard Enterprise) closed at $42.30 on Nov 27 and is an Information Technology stock. VRP is -29.3pp (implied volatility is below realized). The HPE VRP report shows how its options are priced against realized movement at that close. The definition of the measure is in the VRP method.
What the HPE curve compares
The curve plots annualized implied volatility against time to expiration. The glossary entries for term structure and implied volatility explain the shapes and the annualized unit.
The HPE term-structure profile
For Hewlett Packard Enterprise, a 1% move in the shares is under $0.50. Hewlett Packard Enterprise's VRP of -29.3pp shows options priced below realized movement, a reading that is separate from the shape of the curve. Hewlett Packard Enterprise is an Information Technology stock, so its curve can bend around company events such as reports. Hewlett Packard Enterprise's next report is not scheduled, so no report is placed against its curve. Hewlett Packard Enterprise closed at $42.30, so 1% of its price is $0.42. Hewlett Packard Enterprise is a low-priced stock showing implied volatility below realized at the Nov 27 close. The HPE Earnings Crush page answers how implied volatility changed around past reports.
Questions · 6
Questions about HPE Term Structure
Q1What is HPE options term structure right now?
HPE's term structure compares implied volatility across expirations, from near-dated to far-dated; the current HPE implied volatility curve is not published in the public view. What is public at the Nov 27 close is the 30-day comparison of implied with realized volatility: VRP is -29.3pp (implied volatility is below realized).
A flat, rising or falling curve each says something different about how the market prices time. For HPE, option prices embed less movement than the stock has recently shown, and no report is scheduled on file.
Q2Is HPE IV curve in contango or backwardation?
Whether HPE is in contango or backwardation needs its curve levels, and this page prints none of them. Contango means longer-dated implied volatility sits above near-dated; backwardation means the reverse, and it often appears when near-term events are priced in.
HPE's VRP is -29.3pp at the Nov 27 close. At this close, the file holds no scheduled report, and the 100 shares behind one contract are a small position.
Q3What does an inverted IV curve mean for HPE?
An inverted curve means near-dated implied volatility is above longer-dated; HPE's own inversion cannot be read from this page. As things stand, there is no scheduled report on file, and one percent of the share price is well under a dollar.
Q4What is a normal IV curve for HPE options?
A normal curve slopes upward, with longer-dated implied volatility above near-dated, because more time leaves more room for uncertainty.
Q5Who can see the current HPE implied volatility curve?
The current HPE implied volatility curve is not published in the public view, whatever the plan. This page reads HPE's Nov 27 close of $42.30 and prints no curve point.
Q6Does HPE's term structure matter when choosing an expiration?
The curve shows how the market prices different expirations of HPE, which matters because an expiration that spans an event carries that event's pricing. On the facts for HPE, no report date is on file, and a small position of 100 shares sits behind each contract.